مهندس الواقع مهندس الواقع
recent

آخر الأخبار

recent
جاري التحميل ...

Airports Systems planning, design and management

 




Airports Systems planning, design and management 
الطبعة الثانية  


رابط التحميل أسفل المقال 👇👇 



المحتويات :  

Part I Introduction

1 The Future of the Airport and Airline Industry

1.1 The Airport Industry in the Early Twenty-First Century

1.2 Long-Term Growth

1.3 Organizational Change

Low-Cost and Integrated Cargo Airlines

Privatization

Globalization

1.4 Technological Change

1.5 Implications for Airports Systems Planning and Design

Exercises 




References

2 The Evolving Airline Industry: Impacts on Airports

2.1 Trends in Airline Fleets

2.2 Airline Network Structures

2.3 Airline Scheduling and Fleet Assignment Optimization

2.4 Airline Operations at the Airport

2.5 Airline Operating Costs and Productivity

2.6 Summary

Exercises

References

3 International Differences


إقرأ أيضاً 



3.1 Introduction

3.2 Some Physical Differences

Check-in Facilities

Aircraft Contact Stands

3.3 Some Useful Distinctions

National Differences in Diversity of Decision Making

National Differences in Performance Criteria

3.4 Implications for Practice

General Implications

Specific Implications

Exercises


إقرأ أيضاً الاشراف على تنفيذ شبكات الصرف الصحي دليل المهندسين والمشرفين الفنيين بالموقع



Part II Systems Planning Design and Management

4 Dynamic Strategic Planning

4.1 Planning Concepts

Plans

Master Plans

Strategic Plans

4.2 Systems Perspective

Airport Systems

Planning Airport Systems

4.3 The Forecast Is “Always Wrong”

Cost Estimation

Aggregate Forecasts

Effect of Longer Planning Periods

Effect of Economic Deregulation

4.4 Concept of Dynamic Strategic Planning

Assessment of the Issues 


إقرأ أيضاً  open channel hydraulics


Flexible Approach

Proactive Stance

4.5 Dynamic Strategic Planning Process and Methods

4.6 Summary of Dynamic Strategic Planning

Exercises

References 




5 Multi-airport Systems

5.1 Introduction

5.2 Basic Concepts and Issues

Definitions

Prevalence

Unequal Size

5.3 Difficulties in Developing Multi-airport Systems

Insufficient Traffic at New Airport

Difficulty in Closing Old Airport

Insufficient Traffic Overall

Impractical to Allocate Traffic

Volatility of Traffic at Secondary Airport

Overall Perspective 

إقرأ أيضاً حساب الكميات Estimating and costing


5.4 Market Dynamics

Concentration due to Sales Opportunities

Airlines Concentrate on Routes

Airlines Concentrate at Primary Airports

Factors Favoring Multi-airport Systems

5.5 Planning and Developing Multi-airport Systems

Land Banking

Incremental Development

Flexible Facilities

Careful Marketing

5.6 Take-aways

Exercises

References 

إقرأ أيضاً الأساسات للدكتور أسامة مصطفى الشافعي


6 Aviation Environmental Impacts and Airport-Level Mitigations

6.1 Introduction

6.2 Aircraft Noise

Background

Aircraft Noise Sources

Measuring Aircraft Noise and Its Impacts

Airport-Level Noise Mitigations

6.3 Air Quality

Background

Air Quality Emissions Sources

Measuring Air Quality and Its Impacts

Airport-Level Air Quality Mitigations 


إقرأ أيضاً ميكانيكا التربة والاساسات الجزء الاول الدكتور الشريف محمد عبد العزيز



8.1 Introduction

8.2 Cost and Revenue Centers

8.3 Guidelines and Background for the Setting of User Charges

8.4 The Various Types of Airport User Charges

Landing Fee

Terminal Area Air Navigation Fee

Aircraft Parking and Hangar Charges

Airport Noise Charge

Emissions-Related Charges

Passenger Service Charge

Cargo Service Charge

Security Charge

Ground Handling Charges

En Route Air Navigation Fee

8.5 Nonaeronautical Charges

Concession Fees for Aviation Fuel and Oil

Concession Fees for Commercial Activities

Revenues from Car Parking and Car Rentals

Rental of Airport Land, Space in Buildings, and Assorted Equip-

ment 

إقرأ أيضاً حساب وتصميم الأساسات المهندس عماد درويش


Fees Charged for Airport Tours, Admissions, etc

Fees Derived from Provision of Engineering Services and Utilities

Nonairport Revenues

8.6 Distribution of Airport Revenues by Source

8.7 Comparing User Charges at Different Airports

Government Funding

Coverage of Charges and Quality of Services Offered

Volume of Traffic

Size and Timing of Capital Expenditures

Characteristics of Traffic

General Cost Environment

Accounting Practices

Treatment of Nonaeronautical Revenues

8.8 Ground Handling Services

8.9 Landing Fee Computation: Average-Cost Pricing

8.10 Historical Cost versus Current Cost

Exercises

References 

إقرأ أيضاً قاموس المهندس المدني




Part III The Airside

9 Airfield Design

9.1 Introduction

9.2 Airport Classification Codes and Design Standards

Reference Codes for Aircraft Classification

Airport Reference Code

Practical Implications

Runway Designation and Classification

9.3 Wind Coverage

9.4 Airport Layouts

Land Area Requirements and Related Observations

Airport Layouts

9.5 Runway Length

Declared Distances

Usability of a Runway 

إقرأ أيضاً هندسة الأساسات تصميم وتنفيذ الأساسات العميقة والخاصة للدكتور السيد عبد الفتاح القصبي


Practical Considerations

9.6 Runway Geometry

Separations from Other Parts of the Airfield

Vertical Profile

9.7 Taxiways

Dimensional Specifications and Separations

Special Cases

9.8 Aprons

9.9 Physical Obstacles

Exercises

References

10 Airfield Capacity

10.1 Introduction

10.2 Measures of Runway Capacity

10.3 Factors Affecting the Capacity of a Runway System

Number and Geometric Layout of the Runways

ATM Separation Requirements

Visibility, Ceiling, and Precipitation

Wind Direction and Strength

Mix of Aircraft 




References

13 Air Traffic Management

13.1 Introduction

13.2 Evolution and Main Characteristics of ATM Systems

Airspace Structure

Handling of a Typical Airline Flight

Airport Traffic Control Tower

Terminal Airspace Control Center

Surveillance

Navigation for Precision Instrument Approaches

En Route Control Centers

13.3 Air Traffic Flow Management

Objectives and Limitations of ATFM

ATFM Operations

Ground Delay Programs

13.4 Collaborative Decision-Making

Additional Technical Issues and Extensions

13.5 Near- and Medium-Term Enhancements

Exercises

References 

إقرأ أيضاً  الكود المصري لتصميم وتنفيذ المنشآت الخرسانية كود رقم ٢٠٣_٢٠١٧



Part IV Landside

14 Configuration of Passenger Buildings

14.1 Overview

14.2 Importance of Selection

14.3 Systems Requirements for Airport Passenger Buildings

General Considerations

Passenger Perspective

Airline Perspective

Owners’ Perspective

Retail Perspective

Government Agencies

Balance

14.3 Five Basic Configurations 






عن الكاتب

علاء الدين محمود

التعليقات


اتصل بنا

إذا أعجبك محتوى مدونتنا نتمنى البقاء على تواصل دائم ، فقط قم بإدخال بريدك الإلكتروني للإشتراك في بريد المدونة السريع ليصلك جديد المدونة أولاً بأول ، كما يمكنك إرسال رساله بالضغط على الزر المجاور ...

جميع الحقوق محفوظة

مهندس الواقع